-
Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field surveys completed included sampling of fish species assemblages and habitat... -
Water Quality in the Toboggan Creek Watershed 1996-1998: Are Land Use Activit...
FO Habitat and Enhancement Branch initiated water quality monitoring in Toboggan Creek watershed in early 1996. Toboggan Creek is an important nursery stream for both wild and hatchery fish, primarily coho, pink, steelhead and Dolly Varden, with smaller... -
Water Quality Assessment and Objectives for Toboggan Creek and Tributaries: T...
The purpose of this report is to assess the water quality and aquatic ecosystem data gathered to date and to recommend water quality objectives specific to the Toboggan Creek watershed. Designated water uses, to be protected by water quality objectives, are... -
Upper Skeena and Kispiox River Juvenile Steelhead Surveys 1999
In 1999, the Ministry of Environment, Lands, and Parks surveyed portions of the Upper Skeena River and Kispiox Rivers during September 1999 for juvenile steelhead and fry and parr abundance. This report summarizes the results of those surveys and provides a... -
The Skeena River Estuary Status of Environmental Knowledge to 1975: Report of...
This report compiles and summarizes knowledge on the Skeena River Estuary, providing useful background information for those concerned with environmental impacts of these and other contemplated developments. -
Skeena Environmental Effects Monitoring (EEM) Pre-Design Reference Document
This document provides a basis for the design phase of an environmental effects monitoring program (EEM) for Repap's pulp and paper mill, Skeena Cellulose Inc., located near Prince Rupert, British Columbia. The pre-design document is essentially a "State of... -
Review and Assessment of Water Quality in the Skeena River Watershed, British...
Historical water quality data presented for the Skeena River watershed are divided into nine subsequent sections, corresponding to the nine major watershed reaches. Each section is divided into 6 subsections: hydrology, land use history, water withdrawals,... -
Results of the Kloiya River Resistivity Counter
The objective of this study was to quantify juvenile steelhead abundance and estimate values for habitat capacity thresholds. In 2005, the Ministry of Environment (MoE) began investigating the potential of using the Kloiya as an index stream for monitoring... -
Refining habitat indicators for Strategy 2 of the Wild Salmon Policy: Identif...
This report provides results from Step 3, Identifying Metrics and Benchmarks for habitat indicators being considered by DFO for Strategy 2 of the Wild Salmon Policy. -
Reconnaissance Level Fish and Fish Habitat Inventory for the Kispiox Forest D...
Forest Renewal BC is implementing fish and fish habitat inventories to provide information required for resource planning. Triton's goals were to describe fish distributions and habitat characteristics, and to provide stream classifications according to the... -
Reconnaissance Fish and Fish Habitat Inventory of the Middle Skeena River Tri...
This fish and fish habitat inventory provides information regarding fish species presence, distribution, and relative abundance, as well as stream reach biophysical data, for use in interpretation of habitat sensitivity and capability for fish production. -
Reconnaissance (1:20,000) Fish and Fish Habitat Inventory Re-sampling of Pete...
This report summarizes past fish inventory efforts and results in context with data collected during re-sampling to present a comprehensive picture of fish distribution in the upper Peter-Aleck drainage. -
Pacific Trail Pipelines Project: Volume 1 Report - Application for Environmen...
This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The Application includes a description of the project, an outline of the Public and First... -
Morice River Stream Survey August 1975
A survey investigating the fish, and especially the steelhead values, of the small feeder creeks of the Morice River was conducted from August 6-15, 1975. The biological data included fish species present, invertebrates, in-stream and bank vegetation,... -
Lakes of the Skeena River Drainage VI: The Lakes of the Upper Sustut River
This report summarizes the study of the lakes of the Upper Sustut River in 1946. Sustut Lake, Asitka Lake, Johanson Lake, Darb Lake, and Spawning lake were surveyed for fish presence and water temperatures were recorded. -
Lakelse Lake Water Quality Assessment and Objectives
This study assesses the water quality of Lakelse Lake. A summary report and detailed technical appendix are included. Report published February 1986. -
Kitimat - Summit Lake Pipeline Looping Project: Assessment Report
The purpose of this Assessment Report is to: describe the Project; summarize the process for the review of the Application; report on the adequacy of the Proponent’s distribution of information during the Application Review; report on whether the... -
Hydrologic Regimes in a Changing Climate: Characteristics and Response of Wet...
Hydrologic regimes in a changing climate: characteristics and responses of wetland and off-channel habitat along the Telkwa River and the implications for juvenile coho salmon. Given changing climatic conditions in British Columbia, Canada, there is a need... -
Effects of Beaver on Juvenile Coho Salmon Habitat in Kispiox River Tributaries
The purpose of this study was to collect data to determine how beaver dams might affect coho populations in tributaries of the Kispiox River, and to provide a review of the literature on the effects of beaver activity on salmonid populations. -
Distribution, Timing, and Numbers of Steelhead Returning to the Skeena Waters...
This report summarizes the data collected during the July to November 1995 period and describes the fate and timing information of steelhead movements to the end of November 1995. Fishwheels operated by the Kitselas Band Office were used to catch and apply...