-
Westcoast Energy Inc Fireweed Offload Pipeline Project: Fisheries Habitat Ass...
This pre-impact habitat assessment was conducted on June 30, 1994 to identify and evaluate fish habitat along the proposed route associated with this project. -
Upper Bulkley Watershed Hydrometric Stations
Web links to Water Survey of Canada (WSC) and provincial hydrometric data for hydrometric stations in the Upper Bulkley area. Stations include: Bulkley River Near Houston, Buck Creek At The Mouth, Morice River Near Houston, and McQuarrie Creek above Hwy 16... -
Reconnaissance (1:20,000) Fish and Fish Habitat Inventory Shovel/Maxan Sub-Un...
The objective of this project was to conduct a Reconnaissance (1:20,000) Fish and Fish Habitat Inventory in several drainages within the Babine Lake watershed group. This is a continuation of a multi-year FRBC project commenced in 1996 for the Babine Forest... -
Nutrients and Algae in the Upper Bulkley River watershed 1997-2000
This study focused on the diffuse sources of nutrients and the trophic status of the Upper Bulkley River. Monthly water chemistry monitoring of the Upper Bulkley and tributaries was conducted between November 1997 and March 2000, and the end of growing... -
Maxan Creek Stream Survey 1974
This stream survey evaluates Maxan Creek. Elements included are the location, physical characteristics, and water quality of the creek, the species present, and the surrounding anthropogenic activities. -
2008 Stream Assessment for Select Areas and Road Crossings within Nadina Fore...
This report summarizes the results of the stream assessments, which were completed between July 14 and October 22, 2008. All evaluated drainages are within the Babine Lake (BABL), Babine River (BABR), Bulkley River (BULK), Francois Lake (FRAN), Morice River... -
Historical Changes in Channel Morphology in Bulkley River and Maxan Creek
Report includes the analysis of historical air photos to identify the location and magnitude of changes in channel morphology over time. The area of interest is the lower 10 km of Maxan Creek and the upper 10 km of Bulkley River in the vicinity of Bulkley... -
Excel Energy Inc: Birch Oil Sales Pipeline Pre-Impact Fisheries Habitat Asses...
Excel Energy Inc. planned to construct an oil pipeline in the area of the Birch oil field in northeastern British Columbia. The project involved the construction of approximately 36 kilometres of pipeline for the purpose of transporting crude oil from...