-
Report on the Preliminary Survey of Steelhead of Skeena River Drainage Systems
This report represents an effort to compile as much information as possible on the distribution, migration, and life history of steelhead in the Skeena system. Reference was made to regional files, Department of Fisheries publications, Fisheries Research... -
Natural Resource Stewardship Monitoring and Assessment Report for the Wet'suw...
Natural Resource Stewardship Monitoring and Assessment Reports are a summary of existing resource value monitoring and assessment information for a given geographic area. Data in this report has been arranged into the following categories: fish and water,... -
Habitat Improvement and Outplanting Possibilities - Upper Bulkley/ Morice Sys...
The NCD Habitat Unit, along with coho biologists from the Science Branch, conducted a juvenile coho sampling program on the Upper Bulkley/Morice River systems during the month of August from 1987 to 1990. This study furthers the understanding of coho... -
British Columbia Fish Passage Program
The project objectives for Maxan creek were to remove the Strimbold Bridge that is impacting fish habitat and likely a barrier to fish passage at some flows, and may pose an environmental risk if washed downstream due to flood event. -
A Brief Overview of Fish, Fisheries and Aquatic Habitat Resources in the Mori...
The objective of this report is to present a concise distillation and elaboration where necessary, of the existing knowledge, studies and reports related to fish, fish habitat, other aquatic resources, riparian management, and generally factors related to... -
2008 Stream Assessment for Select Areas and Road Crossings within Nadina Fore...
This report summarizes the results of the stream assessments, which were completed between July 14 and October 22, 2008. All evaluated drainages are within the Babine Lake (BABL), Babine River (BABR), Bulkley River (BULK), Francois Lake (FRAN), Morice River... -
Suskwa River Steelhead Trout: The 1977 Inventory, Creel Survey and Life Histo...
The 1977 aspect of the Suskwa River project began in July and continued until freeze-up in November. Fish were sampled either with "Gees" traps or by angling. The inventory crew switched to a casual creel survey and an adult steelhead tagging program during...