-
Returning Salmon: Integrated Planning and the Wild Salmon Policy in B.C.
The federal Wild Salmon Policy provides an excellent opportunity to both greatly improve salmon management and to achieve significant progress in meeting other ecosystem management commitments. So far, Fisheries and Oceans Canada staff have built a strong... -
Fisheries Problems Associated with the Development of Logging Plans within th...
This report has been prepared primarily to describe the fisheries problems associated with a large scale logging operation proposed for the system and to outline certain proposals which are considered necessary for the protection of the salmon resource of... -
Federal - Provincial Joint Committee on Tsimpsean Penninsula Port Development...
Federal - Provincial Joint Committee on Tsimpsean Penninsula Port Development Prince Rupert Bulk Loading Facility - Phase 1 and 2 Phase 1: Bulk Marine Terminal Sites (Engineering Aspects) Phase 2: Environmental Assessment of Alternatives Northcoast... -
Cranberry Sustainable Resource Management Plan
The Cranberry Sustainable Resource Management Plan (SRMP) is a landscape level plan developed to address sustainable management of land, water and resources in the Cranberry Landscape Unit which is described as Timber Supply Block G, a portion of Timber... -
Bulkley Land and Resource Management Plan
The Bulkley Land and Resource Management Plan (LRMP) is a sub-regional land use plan covering approximately 760,000 hectares of north central British Columbia. This LRMP will guide management of public lands and resources for the Bulkley Plan Area which... -
Babine Watershed Indicator Data Summary Report
This report, commissioned by the Babine Watershed Monitoring Trust, is part of the mandate to monitor the effectiveness of land management plans covering the Babine Watershed. The effectiveness indicators analyzed are: for Biodiversity objective -deciduous... -
Zymoetz and Clore River Steelhead Trout: A Report on the 1978 and 1979 Sport ...
This paper presents data collected during a creel census conducted in the years 1978 and 1979, and includes information on angler harvest and success, and life histories of Zymoetz-Clore steelhead. -
Westcoast Connector Gas Transmission Project: Conceptual Freshwater Fish Habi...
This freshwater CFHOP outlines the strategy and framework for development of the Final Fish Habitat Offsetting Plan (FHOP). A marine CFHOP companion document has also been prepared. The FHOP will be developed via discussions with regulatory agencies and... -
Water Quality and Accumulation of Periphyton (attached algae) in the Bulkley ...
In recent years, studies in the upper Bulkley River upstream of Houston have noted elevated levels of bacteria, nutrients and attached algae (periphyton). A 1992 fisheries study in the upper Bulkley at Houston found fish species composition was dominated by... -
Timber Harvesting Practices and Mountain Goat Habitat Project 2007–3
Mountain goats have been identified as a monitoring priority for the Babine watershed Monitoring Trust (BWMT) for the last two years. In 2007, the BWMT initiated a background review to gather information and/or data made available after the inception of the... -
The Socio-Economic Importance of Maintaining the Quality of Recreational Reso...
This paper reports on a series of surveys conducted during the summer of 1973 to determine the economic and social value of Lakelse Lake to residents of British Columbia. The study contains information on the lake's commercial and recreational activities... -
The Babine River Watershed: An Annotated Bibliography of Inventory, Monitorin...
This bibliography was completed to provide an information base to the Babine Watershed Monitoring Group. This group is being established to coordinate monitoring of resource management plans and activities in the Babine River watershed, in North Central BC. -
Tenas Project Application Information Requirements 2022
The Application Information Requirements (AIR) specifies the information that Telkwa Coal Limited (the Proponent) is required to provide in their Application for an Environmental Assessment Certificate (Application) under section 16(2) of the British... -
Telkwa Coal Project Appendix 8: Geotechnical and Hydrogeological Investigatio...
Piteau Engineering Ltd. (PEL) was retained by Manalta Coal Ltd. (Manalta) to conduct a series of geotechnical and hydrogeological investigations in support of the proposed Telkwa Coal Project near Telkwa, B.C. The work program for this investigation was... -
Telkwa Coal Project Appendix 6: Baseline Data, Surface Water, and Groundwater...
Samples were collected for the first time from a watercourse on the proposed project site on the north side of the Telkwa, and from sites on the Telkwa River and Goathorn Creek which were previously sampled in 1988. Samples were also collected from the... -
Telkwa Coal Project Appendix 12: Aquatic Resource Assessment 1985
Studies were undertaken during 1984 to evaluate aquatic resources in the Telkwa Project study area in west-central British Columbia. Stream periphyton, invertebrates, and fish populations were assessed in Goathorn and Tenas creeks and the lower Telkwa... -
Strategic Land Use Planning Agreement Between Metlakatla First Nation and the...
The Metlakatla and the Province of BC entered into the General Protocol on Land Use Planning and Interim Measures (the 'General Protocol' April 2001) and the "Tsimshian Nation Tri-partite Accord on Lands and Resources", wherein the Parties committed to work... -
Range of Variation in Structural Attributes of Harvested Stands in the Babine...
This report provides information on structure remaining following managed disturbance (timber harvesting) within the Babine River Watershed as a basis for direct comparisons between residual structure present after wildfire, bark beetle attack, wind throw... -
Pacific Trail Pipelines Project: Volume 1 Report - Application for Environmen...
This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The Application includes a description of the project, an outline of the Public and First... -
Pacific Trail Pipelines Application Volume II: Baseline Studies
These baseline studies cover the following topics with regards to the impacts of the Pacific Trail Pipeline: acid rock drainage and metal leaching, acoustic environment, air quality, archaeology, contaminated sites, fish and fish habitats, forestry,...