Biophysical, Socio-Economic, and Regional Data and Information (BERDI)
BERDI – a data bank for Biophysical, (Socio)Economic, and Regional Data and Information (pronounced “birdie”) - was created to make data collected by the Canada Energy Regulator (CER) more accessible to the public. Since 1965, the CER has collected... -
Northwest Cumulative Effects Case Study
The Northwest pilot has investigated a range of cumulative effect related topics as well as developed methods to assess impacts of industrial development on a selection of values at a broad spatial scale. The goal of the pilot was to improve the consistency... -
Impacts of LNG Development to Salmon Habitat on Lelu Island and Flora Bank
This report outlines the unaddressed issues that remain after the mitigation proposal presented by Petronas for a suspension bridge over Flora Bank. -
Federal - Provincial Joint Committee on Tsimpsean Penninsula Port Development...
Federal - Provincial Joint Committee on Tsimpsean Penninsula Port Development Prince Rupert Bulk Loading Facility - Phase 1 and 2 Phase 1: Bulk Marine Terminal Sites (Engineering Aspects) Phase 2: Environmental Assessment of Alternatives Northcoast... -
Annual Compendium of Aquatic Rehabilitation Projects for the Watershed Restor...
B.C.'s Watershed Restoration Program (WRP) was implemented under the Province's Forest Renewal Plan in mid-1994 in response to a historical lack of mechanisms for ensuring rehabilitation of logging-impacted hill slopes, riparian areas, and streams. -
Wet'suwet'en Title & Rights and Coastal GasLink
The Office of the Wet'suwet'en (OW) presents this submission to British Columbia Environmental Assessment Agency (BC EAO). This submission is a component of the Wet'suwet'en response in respect of the proposed Coastal GasLink pipeline project within... -
Wet'suwet'en Submission to the Canadian Environmental Assessment Agency - Pac...
This submission from the Office of the Wet'suwet'en (OW) to the Canadian Environmental Assessment Agency (CEAA) is a response to the CEAA report regarding the proposed Pacific NorthWest LNG project near LeLu Island. -
Westcoast Energy Inc Fireweed Offload Pipeline Project: Fisheries Habitat Ass...
This pre-impact habitat assessment was conducted on June 30, 1994 to identify and evaluate fish habitat along the proposed route associated with this project. -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments proposed for British Columbia. The purpose of the Application is to provide an... -
Telkwa Coal Project Appendix 8: Geotechnical and Hydrogeological Investigatio...
Piteau Engineering Ltd. (PEL) was retained by Manalta Coal Ltd. (Manalta) to conduct a series of geotechnical and hydrogeological investigations in support of the proposed Telkwa Coal Project near Telkwa, B.C. The work program for this investigation was... -
Telkwa Coal Project Appendix 6: Baseline Data, Surface Water, and Groundwater...
Samples were collected for the first time from a watercourse on the proposed project site on the north side of the Telkwa, and from sites on the Telkwa River and Goathorn Creek which were previously sampled in 1988. Samples were also collected from the... -
Telkwa Coal Project Appendix 12: Aquatic Resource Assessment 1985
Studies were undertaken during 1984 to evaluate aquatic resources in the Telkwa Project study area in west-central British Columbia. Stream periphyton, invertebrates, and fish populations were assessed in Goathorn and Tenas creeks and the lower Telkwa... -
Technical and Management Proposal: Impact of Coal Dust on Marine Environment ...
The report contains a concise summary report outlining the findings of this study on the potential impact of coal and coal contaminated sediments on marine life. -
Technical Data Report: Conceptual Freshwater Fish Habitat Compensation Plan E...
The objectives of this plan are three-fold. First, the plan describes the methods that will be used to quantify the amount of compensatory fish habitat needed to offset the harmful alteration, disruption, or destruction (HADD) resulting from the Project.... -
Skeena Environmental Effects Monitoring (EEM) Pre-Design Reference Document
This document provides a basis for the design phase of an environmental effects monitoring program (EEM) for Repap's pulp and paper mill, Skeena Cellulose Inc., located near Prince Rupert, British Columbia. The pre-design document is essentially a "State of... -
Skeena Cellulose Inc. Environmental Effects Monitoring (EEM) Cycle Three Desi...
The purpose of this design document is to summarize and update mill process information and results from previous cycles and other studies, and to provide a rationale for the design of the Cycle Three program. Five elements of the EEM program will be... -
Reconnaissance (1:20,000) Fish and Fish Habitat Inventory Subdrainages in the...
The objective of this project was to conduct a Reconnaissance (1:20,000) Fish and Fish Habitat Inventory in several drainages in the Bulkley River watershed. This included portions of the Crow and Maxan Creek watersheds in addition to three small... -
Prince Rupert Area Coastal Fish Habitat Bibliography
A bibliography of existing coastal information describing habitat and biota. -
Pacific Trail Pipelines Project: Volume 1 Report - Application for Environmen...
This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The Application includes a description of the project, an outline of the Public and First...