-
2008 Assessment of Forestry Road Crossings in the Kispiox River Watershed Usi...
The purpose of the 2008 Kispiox River Watershed, Forestry Road Crossing Assessment Project was to protect fish habitat by identifying stream crossings within the Cullon, Ironside, and Lower Kispiox Watersheds that are producing road related sediment that... -
Fish Passage GIS Analysis Version 2 Methodology and Output Data Specification...
The BC Land Based Investment (LBI) fish passage program is focused on remediating stream crossings that impede freshwater fish migration. The most common barrier to fish is improperly designed and installed closed bottom structures such as culverts.... -
Impacts of LNG Development to Salmon Habitat on Lelu Island and Flora Bank
This report outlines the unaddressed issues that remain after the mitigation proposal presented by Petronas for a suspension bridge over Flora Bank. -
Fisheries Problems Associated with the Development of Logging Plans within th...
This report has been prepared primarily to describe the fisheries problems associated with a large scale logging operation proposed for the system and to outline certain proposals which are considered necessary for the protection of the salmon resource of... -
Fish Passage Assessment of Kispiox Forestry Road Stream Crossing
The purpose of this report is to present background information and survey results for fish passage assessments conducted at Kispiox forestry road stream crossings. The Kispiox fish passage assessment is part of a larger regional effort to improve fish... -
Federal - Provincial Joint Committee on Tsimpsean Penninsula Port Development...
Federal - Provincial Joint Committee on Tsimpsean Penninsula Port Development Prince Rupert Bulk Loading Facility - Phase 1 and 2 Phase 1: Bulk Marine Terminal Sites (Engineering Aspects) Phase 2: Environmental Assessment of Alternatives Northcoast... -
Environmental and Socio-Economic Effects Report
This report is part of BC Hydro's transmission line from Terrace to Kitimat planning process to identify potential Project effects and proposed mitigation for biophysical or socio-economic study topic. -
Davidson Project Meteorology and Hydrology Baseline Report 2006-2008
This meteorology and hydrology baseline report summarizes results from 2006, 2007, and 2008 from the Davidson meteorology station and for 6 hydrometric stations established for the Davidson Project. It also includes available data from government operated... -
Canadian Technical Report of Fisheries and Aquatic Sciences
Technical reports contain scientific and technical information that contributes to existing knowledge but which is not normally appropriate for primary literature. Technical reports are directed primarily toward a worldwide audience and have an... -
Bulkley River Bank Stabilization and Riparian Rehabilitation (Telkwa, BC)
The goal of the Bulkley River Bank Stabilization and Riparian Rehabilitation Project was to re-establish a stand of native riparian zone plants immediately adjacent to the Bulkley River. -
Aquatic Resource Baseline Studies Telkwa Coal Project 1997 - Draft 2
Aquatic studies were conducted in the vicinity of the Telkwa Coal Project during 1997. These studies included updating baseline information describing the periphyton and benthic communities in Goathorn and Tenas creeks (Section 1), as well as studies of... -
Analysis of Skeena River Tributaries Downstream from the Proposed Enbridge Pi...
This study's objective was to develop and map metrics that delineate the areas of the Skeena River and its tributaries most vulnerable to potential pipeline spills associated with the proposed Enbridge corridor to Kitimat, BC. -
Water Monitoring in British Columbia: Scanning the Data Landscape Public Report
The overall goal of this scan is to inform a shared vision for water monitoring and reporting in BC. This scan collected information on surface and groundwater quality and quantity monitoring and reporting in British Columbia, providing examples of who is... -
Upper Bulkley River Watershed Stream Surveys Summer 2007
A stream assessment study was conducted between July and August 2007 for several creeks in the Bulkley River watershed east of Houston, British Columbia. The study area consisted of five creeks of interest - Richfield Creek, Johnny David Creek, Byman Creek,... -
The Morice WFSP-Planning Linkages and Forest Licensee Support
The objectives of this report are to provide: (1) a summary of the challenges and successes faced in integrating the Morice Watershed-based Fish Sustainability Plan (WFSP) process with other planning processes, (2) recommendations for improving WFSP... -
The Changing Geography of Salmon Canning in British Columbia 1870-1931
A thesis explaining the changing geography of British Columbia's commercial salmon canning industry between 1870 and 1931. -
Tenas Project Public Consultation Plan
The Tenas Project Public Consultation Plan aims to capture past and future engagement activities between Telkwa Coal Limited (TCL) and the local community and stakeholders, identifying the issues the project may cause and responding to comments and... -
Tenas Project Indigenous Consultation and Engagement Plan
The primary purpose of the Indigenous Consultation and Engagement Plan is to describe the approach, methods and activities TCL is proposing to implement to continue its efforts to build and establish a collaborative partnership with the Wet’suwet’en and to... -
Tenas Project 2017-2018 Baseline Report Final
This consolidated baseline report aims to provide information on field programs and their respective field summaries for the the 2017 to spring 2018 programs of the Tenas Project. -
Tenas Project 2017-2018 Baseline Report Draft
This consolidated baseline report aims to provide information on field programs and their respective field summaries for the the 2017 to spring 2018 programs of the Tenas Project.