-
2008 Assessment of Forestry Road Crossings in the Kispiox River Watershed Usi...
The purpose of the 2008 Kispiox River Watershed, Forestry Road Crossing Assessment Project was to protect fish habitat by identifying stream crossings within the Cullon, Ironside, and Lower Kispiox Watersheds that are producing road related sediment that... -
Fisheries Problems Associated with the Development of Logging Plans within th...
This report has been prepared primarily to describe the fisheries problems associated with a large scale logging operation proposed for the system and to outline certain proposals which are considered necessary for the protection of the salmon resource of... -
Federal - Provincial Joint Committee on Tsimpsean Penninsula Port Development...
Federal - Provincial Joint Committee on Tsimpsean Penninsula Port Development Prince Rupert Bulk Loading Facility - Phase 1 and 2 Phase 1: Bulk Marine Terminal Sites (Engineering Aspects) Phase 2: Environmental Assessment of Alternatives Northcoast... -
Davidson Project Meteorology and Hydrology Baseline Report 2006-2008
This meteorology and hydrology baseline report summarizes results from 2006, 2007, and 2008 from the Davidson meteorology station and for 6 hydrometric stations established for the Davidson Project. It also includes available data from government operated... -
Tenas Project Public Consultation Plan
The Tenas Project Public Consultation Plan aims to capture past and future engagement activities between Telkwa Coal Limited (TCL) and the local community and stakeholders, identifying the issues the project may cause and responding to comments and... -
Tenas Project Indigenous Consultation and Engagement Plan
The primary purpose of the Indigenous Consultation and Engagement Plan is to describe the approach, methods and activities TCL is proposing to implement to continue its efforts to build and establish a collaborative partnership with the Wet’suwet’en and to... -
Tenas Project 2017-2018 Baseline Report Final
This consolidated baseline report aims to provide information on field programs and their respective field summaries for the the 2017 to spring 2018 programs of the Tenas Project. -
Tenas Project 2017-2018 Baseline Report Draft
This consolidated baseline report aims to provide information on field programs and their respective field summaries for the the 2017 to spring 2018 programs of the Tenas Project. -
Ridley Island Export Logistics Park Project Environmental Effects Evaluation
Environmental effects evaluation for the Ridley Island Export Logistics Park Project. The project is an export logistics platform that is intended to enhance the Port of Prince Rupert's export transloading capacity and improve operational logistics. -
Ongoing Legacy of Metal Mines on Babine Lake
An assessment of discharge regulation, aquatic monitoring, and aquatic impacts related to Bell and Granisle Mines. -
Northwest Transmission Line EAO Inspection Records
Environmental Assessment Office inspection records for the Northwest Transmission Line project. The Environmental Assessment Office (Chris PARKS, Compliance Officer) completed an inspection of portions of the Northwest Transmission Line Project against... -
Morrison Copper/Gold Mine Project Third Party Review of Groundwater, Water Qu...
EAO wishes to retain an independent, expert, third party consultant to undertake a technical review of the hydrogeology, hydrology, water balance, water quality, and related aquatic resources and fisheries components of the EA, in particular with a focus on... -
Mid Skeena Watershed Restoration Effectiveness Monitoring
In 2006, Gitksan Watershed Authorities was retained by the Pacific Salmon Commission to conduct an effectiveness monitoring in three Mid Skeena sub-basins: the Kispiox, Kitseguecla, and the Suskwa. This watershed restoration effectiveness monitoring... -
Fairview Terminal Phase II Expansion Project Comprehensive Study Report
The Prince Rupert Port Authority (PRPA) and Canadian National Railway Company (CN) are proposing the construction and operation of a wharf extension and expanded container and intermodal facilities at the existing Fairview Terminal and the construction and... -
Environmental Studies on the Morice-Nanika Watershed Interim Report (1975)
B.C. Hydro has proposed developing various resources for meeting future electric power requirements of the province. The main resources included are: hydro-electric power, coal, oil, natural gas, wood waste, and geo-thermal power. Prior to any development... -
Bulkley River Project: Fabrication and Delivery of Structural Steel for Adult...
This document contains diagrams for fish fence models, such as guide frames, walkway panels, fry screen structures, and more. -
British Columbia Environmental Assessment Act and Regulations
British Columbia’s Environmental Assessment Act requires that certain large-scale project proposals undergo an environmental assessment and obtain an environmental assessment certificate before they can proceed. The current legislation came into effect in... -
Morrison Mine Re-Consideration and Comments of Pacific Booker Minerals on the...
Comments from the Gitanyow Hereditary Chiefs on the Morrison copper/gold mine proposal. -
Floodplain Stability, Morice River, Between Owen Creek and Thautil River
A geomorphological study of the Morice River floodplain, between the confluence of the Thautil River and Fenton Creek (Reach 2), was undertaken at the request of the Forest Service, Morice Forest District to identify the extent of the floodplain and prepare... -
Draft Environmental Effects Evaluation/Application for an Environmental Asses...
Vopac Pacific's overview of the environmental effects of the construction and opertation of the Vopac Pacific Canada Project, which will store Liquified Petroleum Gas, Clean Petroleum Products, and methanol.