Restoration Center of Expertise - SEHAB March 2023 Meeting
Presentation and slides for the Restoration Center of Expertise - SEHAB March 2023 Meeting, connected to the Pacific Salmon Strategy Initiative. -
Deep Creek Side Channel and Bank Stabilization
The Deep Creek side channel and bank stabilization project is intended as a demonstration project to create off-channel rearing and overwintering habitats for salmonids... -
Upper Bulkley River Riparian Restoration
In effort to ameliorate riparian vegetation and reduce streambank erosion on the Upper Bulkley River, Maxan Creek and Richfield Creek, willow cuttings were planted and... -
McDowell Creek Culvert Replacement
This project focused on the replacement of a defunct culvert, that blocked fish access to 450 metres of important off-channel rearing habitat, approximately 130 metres upstream... -
Robert Hatch Creek Bridge Removal
This project focused on the removal of an old, collapsed wooden bridge where the creek passed through the Hatch Creek Ranch. Removal of this barrier and the restoration of... -
Cross Creek Culvert Replacement
This project focused on the replacement of two culverts close to Babine Lake, which became impassable to fish due to debris and low flow, especially at the time of year that... -
Richfield Creek Riparian Exclusion Fencing and Restoration
Richfield Creek was included in a larger riparian restoration initiative in 2021 through the Morice Water Monitoring Trust (see dataset: Upper Bulkley Riparian Restoration). The... -
Spring Creek Project Dairy Street Landslide Rehabilitation
Spring Creek is a tributary to the Kalum River, close to Terrace. After a small landslide at the west end of Dairy Street in Terrace was discovered, which posed a potential... -
Exchamsiks Backchannel Rehabilitation 2008
The Exchamsiks Backchannel area was recognized as having tremendous potential to provide necessary juvenile salmonid habitat in the lower Skeena River. The project focused on... -
Kumealon Creek Instream Construction
Two instream rehabilitation projects were implemented in Kumealon Creek, located 56 km south of Prince Rupert. The site is only accessible by boat or air. The creek has high... -
Nilkitkwa River Fish Passage Restoration
Assessment found that a pre-code fish crossing on an unnamed stream in the Nilkitkwa river watershed acted as a partial barrier to juvenile fish passage upstream due to high... -
Xsi Tsihl Hlii Din (McCully Creek) Restoration Initiative
The McCully Creek Restoration Initiative is a collaborative multi-year, Gitksan-led project to restore access, connectivity, and quality of salmon habitat using low-tech,... -
Copper River Watershed Restoration Program: Debris Catcher Construction
Goals of the project included the improvement of fish habitat and educational purposes such as showing debris catchers as alternatives to traditional riprap bank protection for... -
Copper River Watershed Restoration Program: Site 9 Berm Removal & 3km Side Channel
Site 9 is a 300 m long groundwater channel that was excavated in 1998 within a flood channel to the Copper River, adjacent to 3 km along the Copper Forest Service Road. This... -
Copper River Watershed Restoration Program: Copper River 3Km Off-channel Site
One project aim was the improvement of fish habitat. The site is located adjacent to the Copper River forest services road, between km 2 and 3, approximately 10 km east of... -
Maxan Watershed Stream Habitat Restoration Works 1998/99
This report included Habitat Restoration Prescriptions for 12 sites on the Bulkley River, 2 sites on Foxy Creek, and 1 site on lower Maxan Creek. -
Scully Creek Restoration Project 2013
This report discusses the Scully Creek Restoration Project, which involved improving access to quality spawning habitat by the removal of beaver dams and improved beaver... -
As-built Report of Fish Passage Improvement Projects within the Wet'suwet'en...
This report describes the fish passage restoration projects completed at three high-priority sites on the upper Bulkley River within Wet'suwet'en First Nation territory in 2017.... -
As-built Report of Aquatic Restoration and On-farm Cattle Management...
This report describes the as-built aquatic habitat restoration projects undertaken at four high-priority sites along the upper Bulkley River within Wet'suwet'en First Nation... -
As-built Report of Aquatic Restoration and On-farm Cattle Management...
This report describes the aquatic habitat restoration construction completed at the lower Craker Road site and repairs completed to two instream structures within the upper...
També podeu accedir a aquest registre usant l'API API (vegeu Documentació de la API).